Please contact us by this form
Taichiku has worked actively to repair, remodel and maintain products even if they were products of other companies. We do everything from development to manufacturing and maintenance in-house.
We are strong in "Making use of practical examples of repair within the development and making use of technical know-how to produce within the repair".
Taichiku repairs coils not just of our own but also of the other companies.
The spirit of "Welcome other companies' products" is our company culture. This spirit has been cultivated naturally while we have gotten along with customers.
For example, we will repair water leaks of the coil's copper pipe, the damaged coils, loose connections. We will replace the copper pipes and rewind coils.
Taichiku has handled all coils from small-size to large-size even if they were for a 40-ton-class.
Taichiku has taken products to repairs and remodel. We have repair plants.
We have replaced coils with fixed coils and checked of operation at the customer's plants.
We also maintain transformers and inverters of power supplies.
We handle special coils, such as water-cooled ones, double-winding ones and small ones.
Taichiku has responsed to various situations. Such as deterioration of electrical insulators of coils, insulation failures as a consequence of a broken insulating tape, repainting cement of coils, water leaks of coil's copper pipes.
Taichiku has also responsed to overhaul of coils and maintenance equipment. Please do not hesitate to contact us if you need any further information.
Taichiku has responsed to various works at Customers' plants. Such as Installations and relocations of products, electric power distribution works, cooling water pipe laying works.
Taichiku has also responsed to the other works. Please do not hesitate to contact us if you need any further information.
Back to menu
Taichiku are also totally ready for after-sales services of entire units and all related Products.
We have also repaired, renewed and replaced coils, the hearts of the products.
Taichiku has also responsed to the other works. Please do not hesitate to contact us if you need any further information.
Back to menu
Depending on each customer's situation, Taichiku has responsed to various cases.
Furnace bodies and coils from 50kg to 40-ton
Delivery schedule:50days after acceptance
Maintenance a furnace body, Repair and Manufacture a core and yoke coil flus guide.
Renewal and Maintenance copper pipes, Renewal electrical insulators in copper pipes and refractories, Cleaning in copper pipes.
Repair and Manufacture cable of cooling water
Delivery schedule:30days after acceptance
Repair and Manufacture an inductor
Renewal and Maintenance pipe laying of furnace cases and water-cooling jackets and forced air-cooled fans, Cleaning coils
Such as maintenance power disconnect switches and electric conductors.
Remodeling of coils
Remodeling electrical systems and surrounding furnace bodies
Relocations of products
Inspections for preventive maintenance of equipment
Cleaning cooling water system
Taichiku has also responsed to each customer's requests. Please do not hesitate to contact us if you need any further information.
Back to menu
Depending on each customer's situation, Taichiku has responsed to various cases.
Delivery schedule:30days after acceptance
Heating work coils of φ20~φ280 (Please inquire about other sizes.)
Repair and Manufacture a coils. Repair and Manufacture a skid rail, Manufacture a spare coil.
Renewal and Maintenance copper pipes, Renewal electrical insulators in copper pipes and refractories, Cleaning in copper pipes.
Delivery schedule:30days after acceptance
Heating work coils of φ20~φ100 (Please inquire about other sizes.)
Renewal and Maintenance copper pipes, Renewal electrical insulators in copper pipes and refractories, Cleaning in copper pipes.
Such as manufacture and maintenance an electric conductor.
Remodeling of coils
Remodeling electrical systems and surrounding heaters
Relocations of products
Inspections for preventive maintenance of equipment
Cleaning cooling water system
Taichiku has also responsed to each customer's requests. Please do not hesitate to contact us if you need any further information.
Back to menu